Bluewater: Glas Dowr – Taranto Consultancy

Bluewater: Glas Dowr

Photo: The FPSO Glas Dowr travelling to her operating location

Achieving profitable availability levels

Since its foundation in 1978, Bluewater has built a technological lead specialising in design, development, lease and operation of tanker-based production and storage systems, and has become a leading provider of innovative Single Point Mooring systems.

Bluewater currently owns and operates five Floating Production Storage and Offloading Systems (FPSOs): the Glas Dowr, the Bleo Holm, the Hæwene Brim and the Munin, which are producing in the UK, South Africa, and China.

The challenge

The Bluewater owned FPSO Glas Dowr was to be re-located to Bredasdorp Basin, South Africa, for the purpose of producing the ECE and EBD reservoir fluids from the Sable Field. Bluewater will operate the production facilities under contract to Petro SA for the life of the field.

The environmental conditions that the vessel was to operate in were significantly different from those experienced in previous locations and presented a number of challenges to both the operation and support of the vessel.

The issues addressed by Taranto Consultancy arose from the significant increase in bio-fouling potential in Mossel Bay that affected the design, operation and support of the seawater dependent systems. The existing designs, new designs and the support requirements were analysed to identify modifications or strategies required to deal with the new location.

The solution

A review of the existing designs for all seawater influenced systems was undertaken to identify the impact of the new location on overall platform performance in terms of availability. The review used Failure Modes, Effects and Criticality Analysis, Reliability Centred Maintenance Analysis together with a Life Cycle Cost analysis to aid identification of potential problems and evaluate solutions.

The result

The review identified a number of modifications to the existing designs, maintenance procedures and operating strategies that would ensure continued high availability of the platform in the new, adverse environmental, conditions. In particular, the analysis indicated that one design change could achieve overall savings of around $60,000.

عايز تنيك اختك يا خول meyzo.info فيلم سكس رجب
مغربية تتناك pornarabic.net نيك عزراء
hot indian girl nude bustyporntube.net indian boob fuck
hot girls xvideo sexix.mobi xxx bp xxx bp
indian face fuck indaporn.com bengal sex story
sleeping sister sex video newbigtube.mobi sex videos xnxxx
suhagrat open pornview.org malayalam xnx
xxvieos gekso.info hot navel press
abs-cbn regional network group teleseryeme.com balita ngayong araw september 4 2022
xnxxconm xporndirectory.info sunny leon sex video
sex com kannda chupaporntube.com xnxx videos tamil
xnxx.com.com indianassfuck.com thamil sex .com
polarporn hd nurable.mobi sex videos of indian college girl
fsi blogspot makato.mobi tubesexer
porn hud erofreeporn.info xxx punjabi hd video

Warning: PHP Startup: snuffleupagus: Unable to initialize module Module compiled with module API=20190902 PHP compiled with module API=20230831 These options need to match in Unknown on line 0